Upcoming Events

The engineering study was completed as of November 2014. The Preliminary Design Analysis Report (DAR) and associated 15% plans are available for download on this website.

The DMD is currently developing construction plans for the segment of 4th Street from Constitution Avenue to Hannett Avenue. A public meeting will be held in spring 2015 to review the pedestrian improvements that will be constructed.

North Fourth Street
Rank III Corridor Plan

Contact us:

Kellie R. Shaw, Project Manager
Engineering Division
City of Albuquerque Department of Municipal Development
P.O. Box 1293
Albuquerque, NM 87102
Phone: 505-768-3659
Fax: 505-768-2733
kellieshaw@cabq.gov

historic route 66 logo

North Fourth Street Redevelopment Study

The City of Albuquerque Department of Municipal Development (DMD) has completed the engineering study to assess the requirements for implementing the transportation system components of the North Fourth Street Rank III Corridor Plan (14mb pdf), which was approved by the City Council on April 9, 2010. The study limits include the Fourth Street corridor from Mountain Road to Camino Español NW, the Village of Los Ranchos limits, which is approximately 3.8 miles. Click here for a map of the study area (2.1mb pdf) showing the three major zones along the corridor as described in the Rank III Plan.

The purpose of this website is to disseminate the materials developed for the engineering study and to inform the public of project events that were held or are going to be held in the near future.

The engineering study was guided by the objectives contained in Section 4, Transportation and Street Design, of the adopted Rank III Corridor Plan. The project materials available for download include the following:

(Click on the following to download information in Adobe Acrobat PDF)